top of page

FNZ BISHOPSGATE

CASE STUDY

FINANCE

|

BISHOPSGATE, LONDON

Inside FNZ’s Bishopsgate workplace, a fast-growing Fin Tech company on the 10th floor of the iconic 135 Bishopsgate building, the GTA team carried out a full CAT A and CAT B design and build for their new London flagship office. With black Fenix and angled wood fin wall panelling throughout, it became a feature of each of their global offices.

AT A GLANCE

KRIS LOVE, GROUP CFO, FNZ GROUP

GTA interior - what a team! Our journey with GTA began in London when the team created and built our HQ London office. GTA took the time to understand our business, culture and delivered high quality design and fit out within budget and on time, even under the pressure of the Covid pandemic.

BISHOPSGATE, LONDON

10,000 SQ.FT

10 WEEKS

£2,700,000

All good partnerships start with a conversation. Get in contact to speak to a member of the GTA team about your workplace requirements.

LET'S TALK

TEAM SPOTLIGHT

ALI SARAF

ALI SARAF

PROJECT DIRECTOR

CHRIS BRAND

CHRIS BRAND

MANAGING DIRECTOR

HOW WE DID IT...

The client brief was to create a ‘grown up’ fin tech office for FNZ’s new London flagship office. Working closely with both FNZ and the building landlord, British Lands, team, GTA carried out full Design and Build for the CAT A and CAT B of the space. The main reception and client zone feature large format concrete tiles, black Fenix wall panelling and marble reception desk. Angled wood fin wall panelling highlights the curved crittal effect glazing. Cloaking technology applied to the meeting rooms glazing, and one-way glass to the external terrace provides an open feel, whilst maintaining confidentiality by shielding the view of any display screens from outside the room. The main boardroom features a bespoke black marble table, which provides a slick and clear surface, enabled by the fully wireless AV and video conferencing system. Suspended ceiling rafts with acoustic slats provide the height and feel of the exposed services. The large staff teapoint and breakout area provides a link between the client zone and the main open plan office area. A ‘smart’ integrated hydro tap provides instant hot and cold refreshments at the tap of an iPad. Planting and shelving throughout the open plan area help to create team zones, and pockets of collaboration areas. Switch curved glass to the CEO’s office and iPad room booking system add the finishing touches to this hi-tech office, quality finish space.
Diagonal timber slats meet curved glazing with the iconic architecture of 22 Bishopsgate.

Diagonal timber slats meet curved glazing with the iconic architecture of 22 Bishopsgate.

Carrara marble finish to the reception desk with logo cut out.

Carrara marble finish to the reception desk with logo cut out.

Monochrome Fenix finish with pops of yellow Corian details.

Monochrome Fenix finish with pops of yellow Corian details.

THE DETAIL